We are trying to perform the solution "Full Transfer of Client-Specific Data for SAP ERP" using the following systems:
Control/Central System: NetWeaver 7.3 ABAP instance
Sender System: ECC 6.0 EhP5 IDES
Receiver System: Shell System created from Sender System
O/S: Windows 2008 and MSSQL 2008 on all three systems
Kernel: 720 patch 401 on all three systems
The activity "Preparation of Tables for Data Transfer" is aborted after a runtime of almost 5 hours. On the Central System, we looked at SM37 and found that the job CNV_MBTCNV_MBT_PEM_START had failed with only "Activity Preparation of Tables for Data Transfer execution 0002 in package 90002, phase TDBAS_PHASE_PACKAGE_SETTINGS has been aborted" as the error message.
Does anyone know how else I can troubleshoot this issue?